2009 – present – Construction Company DCC Ltd
Technical Director
2008 – 2009 – Construction Company SBS Group Ltd
Director
Managed the company
2007 – 2008 – Construction Company International Building Company Ltd
Technical Department Manager
Supervision of construction process, architectural planning and cost allocation of the penitentiary facilities in Gldani (Ministry of Justice) and military base in Gori (Ministry of Defence of Georgia)
2006 – 2007 – Georgian Health and Social Projects Implementation Center (GHSPIC)
World Bank Project (National Primary Health Care)
Construction works advisor
Supervision of tender process, architectural planning and cost allocation of the primary health care facilities currently in the planning or construction stage by third party subcontractors.
2005-2006 – Construction Company GEO-TEK Ltd.
Tender Department Manager
Preparation of tender documentation, project cost calculations, development of technical definitions, constructions schedules and other aspects related to the completion of new projects
2003-2005 – Construction Company GEO -TEK Ltd. Baku-Tbilisi-Ceyhan Pipeline Project
Construction Manager, Project Manager
Managed the construction works on the site of the Gardabani Pump Station PS-G1 for The BTC Pipeline
Lead the multi-national project team of over 600 individuals in charge of construction
Trained, supervised and evaluated staff. Implemented and monitored the safety guidlines
1999-2003 – Energy Development Ltd.
Technical Director
Managing and supervising design and exploration works
Developing the documents necessary for obtaining construction work licenses and permits
Developing the business plans for rehabilitation or construction of hydro power plants in Georgia
1997-1999 – JSC Georgia Tunnel, Baku-Supsa Pipeline, Western Rout Project
Deputy Project Manager
Managed construction of pump stations PRS-1 and PRS-2 in Chiatura and Zestaponi
Supervised the construction works in order to ensure their compliance with European standards and regulations
Coordinated the domestic and foreign working teams in order to ensure the smooth interaction
1992-1997 – Peri Ltd.
Chief Engineer
Managed the rehabilitation of Ratevani hydropower plant in Bolnisi district of southern Georgia
Managed construction works of Intsoba hydropower plant in Kvareli district of eastern Georgia
1991-1992 – Construction Company Arcdizainmsheni
Design works contractor
Managed the interior design works of the Tbilisi central telegraph building
1990-1991 – Georgian APC Engineering Center
Engineer
Headed the team in charge of developing the technical documentation necessary for building the Georgian APC Construction materials plant
1984-1990 – Construction Company “Zhinvalhesi”
Construction works manager, Site Manager
Lead the group charged with building “Zhinval-Hesi” 220/110 kv open distribution system, compressor station and oil depot
Supervised construction of “Zhinval-Hesi” administrative and technology buildings
Headed and later supervised the group in charge of constructing in Dusheti district, Central Georgia, recreational complex and full scale medical centre
Managed the team in charge of constructing in Zahesi, Tbilisi suburb, a new boiler-house and reconstructing an old one
1980-1984 – Georgian Scientific Research & Design institute of Hydro-technical Construction
Hydrotechnical Engineer
Responsible for research and scientific studies of hydro technical structures